The Chennai Corporation is constructing a new storm water drainage
system along School Road, Thirumangulam. School Road needs a proper drainage
facility, because the entire road gets waterlogged every time whenever there is
a shower.
This new storm water drainage facility which is under construction
would prevent water logging on the road. The Anna Nagar Western Extension area
residents stated the unfinished storm water drainage facility along Park Road
should be expedited at the earliest.
Anna Nagar Western Extension Association
wants he civic authorities to clear encroachments in the waterways connecting
Otteri Nullah and cleaning blockages in drains before the onset of monsoon.
The
Association members request the Chennai Corporation officials to provide storm
water drains in all roads in W-Block, including D Sector 11th Street and
C-Sector10th street. It is reported that Park Road would be re-laid using
plastic materials.
No comments:
Post a Comment