Friday, 3 June 2011

Damaged Bridge Needs To Be Renovated

The small bridge located across Ainsley canal  needs to be renovated and widened. The residents said that a new wider two way bridge needs to be build so that motorists  can easily cross each other without any difficulty. The present bridge is broken and  narrow that it has just enough space for only one vehicle to pass through. An  additional new wide road over bridge alongside the existing small narrow bridge  at the Ayanavaram Railway Colony  will be a crucial link for the residents. 

The area residents hope that the authorities concerned will take steps in constructing a new wider bridge as there is space available, so that it would facilitate easy and safe movement of vehicles and pedestrians as well. The Ainsley canal  has become highly polluted, with dumped waste and wild bushes

No comments:

Post a Comment

Annanagar Daily posts