Saturday, 6 July 2013

Patch Work Undertaken

The battered road surface at Chintamani signal junction has been blacktopped. The road was dug up for laying metro water pipes. 

Since the work was completed, the civic authorities did patch work and blacktopped the uneven spots. 

Residents and motorists hope the authorities would re-lay the entire roads at Anna Nagar East immediately for a smooth drive.

No comments:

Post a Comment

Annanagar Daily posts