Friday, 20 May 2011

Metro Rail Work On Second Avenue Stretch

The Chennai Metro Rail Limited  has recently began the digging work  for soil tests along Anna Nagar Second Avenue road. The Chennai Metro Rail Limted (CMRL) is all set to go ahead with the construction of the mass rapid transit system in the city.
 
The corridor II starts from Chennai Central and passes through EVR Periyar Salai, Vepery, Kilpauk Medical College, Aminjikarai, Shenoy Nagar, Anna Nagar East, Anna Nagar Tirumangalam, Koyambedu, CMBT, Inner Ring Road, Vadapalani, Ashok Nagar, SIDCO and Alandur and ends at St Thomas Mount.Metro Rail will have interconnecting stations at Fort, Central, Egmore, Guindy, Alandur, St Thomas Mount and Koyambedu bus terminus.

No comments:

Post a Comment

Annanagar Daily posts