With the Chennai Metro Rail Limited planning to open the elevated stretch between Koyambedu and St. Thomas Mount by 2015, construction of pillars is apace. In view of the pile foundation work for the elevated corridor there has been certain traffic changes along 100 Feet Road.
The Chennai Metro Rail Limited has completed number of pillars for the elevated section between Koyambedu and Ashok Nagar.
Traffic changes were brought in at the Chennai Mofussil Bus Terminus (CMBT)-Chennai Contract Carriage Bus Terminus (CCCBT) junction in view of the Chennai Metro Rail Work at Koyambedu and 100 Feet Road.
No comments:
Post a Comment